Honda Civic/Acura Integra

since 1994 release

Repair and operation of the car



Honda Tsivik
+ Cars of the Honda Civic and Acura Integra brand
+ Maintenance instruction
+ Routine maintenance
- Engine
   + Repair of the engine without extraction from the car - the Civic model
   - Repair of the engine without extraction from the car - the Integra model
      General information
      Preparatory actions and the list of repair procedures which can be executed without extraction of the engine from the car
      Reduction of the piston of the first cylinder in the provision of the top dead point (TDP)
      Removal and installation of a cover of a head of cylinders
      Removal and installation of the inlet pipeline
      Removal and installation of a final collector
      Removal, check of a state and installation of a gas-distributing belt and cogwheels of the GRM drive
      Replacement of a forward epiploon of a bent shaft
      The VTEC systems - the general information and check of a condition of components
      Removal, check of a state and installation of camshafts and assembly of yokes
      Replacement of valvate springs with plates and maslootrazhatelny caps
      Removal and installation of a head of cylinders
      Removal and installation of the pallet of a case of the engine
      Removal, check of a state and installation of the oil pump
      Replacement of a flywheel / driving disk
      Replacement of a back epiploon of a bent shaft
      Check of a state and replacement of support of a suspension bracket of the power unit
   + General and capital repairs of the engine
+ Cooling system and heating
+ Power supply system and release
+ Engine electric equipment
+ Control systems of the engine
+ Gear shifting box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


5642a57a



Removal and installation of a head of cylinders

Before getting to work, wait for full cooling of the engine.


The components of a motive compartment of the car which are subject to dismantle at removal of a head of cylinders

1 — the Inlet air inlet
2 — the Steering pump
3 — the Line of supply of fuel
4 — the Line of return of fuel
5 — PCV Hose
6 — the Vacuum hose of the amplifier of brakes
7 — Fixture of an expansion bar

8 — the Electromagnetic valve / sensor – VITEC pressure switch
9 — the Tire of grounding of the engine
10 — the Hose of a cooling path
11 — the ignition Distributor
12 — Executive the device of a tempostat
13 — the Top support of the power unit

Removal

 PERFORMANCE ORDER

1. Bring the piston of the first cylinder into the provision of VMT of the end of a step of compression (see Reduction of the piston of the first cylinder in the provision of the top dead point (TDP)).
2. Disconnect a negative wire from the battery and the grounding tire from the engine (see an illustration above).

If the stereosystem established on the car is equipped with a security code before disconnecting the battery make sure that you have the correct combination for input of the audio system in action!


3. Empty the cooling system and turn out spark plugs (see the Head Routine maintenance).
4. Remove the air cleaner with an air inlet sleeve (see the Head of the Power supply system and release).
5. Take off driving belts of auxiliary units (see the Head Routine maintenance). Otboltite the steering pump also take him aside, without disconnecting hydraulic lines, then remove an arm of the steering pump (see the Head Podvesk and steering).
6. Disconnect a cable of an accelerator and dump pressure in a power supply system (see the Head of the Power supply system and release).
7. Disconnect the following hoses and lines (see Chapters of the Power supply system and release and the Control system of the engine):
   a) Hoses of giving and return of fuel;
   b) Hose of system of catching of fuel evaporations (EVAP);
   c) Ventilating hose (branch pipe of a sapun);
   d) PCV hose.
   e) Vacuum hose of the amplifier of brakes.
8. Disconnect perepuskny a cooling system hose, a hose of a heater and the top radiator hose (see the Head of the Cooling system and heating).
9. On the VTEC models remove the expansion bar established across a motive compartment (see the Part the General and capital repairs of the engine of the present Chapter).
10. Disconnect an electrical wiring from the following components:
   a) Fuel injection injectors;
   b) Sensor of temperature of cooling liquid (CTS);
   c) Temperature measuring instrument sensor;
   d) Sensor of VMT/situation cranked and camshafts;
   e) Sensor of fluctuations of a bent shaft;
   f) Ignition coil;
   g) Sensor provision of a butterfly valve (TPS);
   h) The sensor of absolute pressure in the pipeline (MAR);
   i) Electromagnetic valve of a purge of a coal adsorber of the EVAP system;
   j) Electromagnetic VTEC valve (18C1 and 18C5));
   k) Sensor switch of pressure of VTEC (18C1 and 18C5);
   l) Valve of stabilization of turns of idling (IAC);
   m) Electromagnetic valve of a perepuskaniye of inlet air (IAB) (18C1 and 18C5).
11. Remove the actuation mechanism of a control system of the speed (tempostat) (see the Head Onboard electric equipment).
12. Remove protection of a case.
13. Prop up the engine a jack (for the purpose of distribution of loading between a head of a jack and the pallet of a case lay wooden whetstone). Remove an arm of the top support of the engine (see Check of a state and replacement of support of a suspension bracket of the power unit).
14. Remove the assembly bracket supporting the inlet pipeline and turn out bolts of a flange of a final collector.

At will the inlet pipeline and/or a final collector can be separated from the engine (see the Sections Removal and installation of the inlet pipeline and Removal and installation of a final collector) to facilitate further manipulations with a head.


15. Uncover a head of cylinders (see Removal and installation of a cover of a head of cylinders).
16. Remove the ignition distributor (see the Head Elektrooborudovaniye of the engine) together with a cover and wires connected to it by VV.
17. Take off a GRM drive belt (see Removal, check of a state and installation of a gas-distributing belt and cogwheels of the GRM drive), camshafts and assembly of yokes (see Removal, check of a state and installation of camshafts and assembly of yokes).
18. Working as it should be, the return shown on an illustration to paragraph 6 (see below), in stages (on 1/4 turns for approach) weaken bolts of fastening of a head so that the possibility of their reversing manually appeared. Try to remember an arrangement of each of fixing bolts – at assembly they have to be screwed strictly on former places.
19. Remove a head of cylinders from the engine. If the head does not separate from the block, it is possible to use the lever which should be started between an arm of the steering pump and the block (do not hook a head for the interfaced surface at all). Lay the head removed from the engine on pair of wooden blocks in order to avoid damage of pro-masonry surfaces.
20. The description of procedures of dismantling of a head and check of a condition of its internal components is provided in the Part the General and capital repairs of the engine of the present Chapter. At this stage estimate only planeness of the interfaced surface.

Installation

 PERFORMANCE ORDER

1. The interfaced surfaces of a head and the block of cylinders have to be absolutely pure and dry.
2. Carefully smooth out the interfaced surfaces of a head and the block of cylinders. Having scratched out the remains of material build laying and coal deposits, wipe surfaces with the rags moistened in acetone. Existence on the interfaced surfaces of material of old laying at the time of installation can bring to violation of tightness of landing of laying and, as a result, development of leaks. Processing the block, a zakuporta of an opening of cylinders rags in order to avoid hit in them small garbage and various foreign objects (as a last resort, carefully vacuum cylinders). As the head and the block of cylinders are made of soft aluminum alloy, act with extra care, trying not to leave on the interfaced surfaces of scratches and zadir (use only brass or plastic instruments for scraping of deposits).
3. Check the interfaced surfaces of a head and the block for existence of deep scratches, zadir and other damages. Easy defects can be eliminated by means of a fine-grained emery paper. In more serious cases the only alternative is the pro-point of components.
4. A tap of the suitable size banish carving openings under bolts of fastening of a head. Serially clamping bolts in a vice for a head, walk on their carving lerky. Existence in rounds of a carving of old sealant, dirt and products of corrosion results in discrepancy of real effort of tightening of fixture to indications of the indicator of a dynamometer key.

5. Lay on the block of cylinders new sealing laying (marking of the TORAHS type up). Track that openings under the directing pins appeared on the regular places (see an accompanying illustration). Establish into place a masloraspylitel of a head with a new sealing ring. Accurately install a head of cylinders on the block.

6. Grease a carving and the lower surface of heads of fixing bolts with pure motive oil and screw fixture on the former places. Working in that order (see an accompanying illustration), tighten bolts of fastening of a head of cylinders with the required effort (see Specifications).

7. Put on cogwheels pins of camshafts, then establish a gas-distributing belt (see Removal, check of a state and installation of camshafts and assembly of yokes).
8. Installation of the remained components is made as it should be, the return to an order of their dismantle.
9. Do not forget to fill the cooling system and to check levels of all liquids (see the Head Routine maintenance).
10. Manually slowly turn a bent shaft counterclockwise on two whole revolutions.

If at a provorachivaniye of a shaft there is resistance, immediately stop in order to avoid damage of valves at their contact with the bottoms of pistons.


11. Start the engine and check correctness of installation of a corner of an advancing of ignition (see the Head Routine maintenance).
12. Warm up the engine up to the normal working temperature and check it for existence of signs of leaks. Make sure of serviceability of functioning of the engine.