Honda Civic/Acura Integra

since 1994 release

Repair and operation of the car



Honda Tsivik
+ Cars of the Honda Civic and Acura Integra brand
+ Maintenance instruction
+ Routine maintenance
+ Engine
- Cooling system and heating
   Specifications
   Antifreeze - general information
   Check of serviceability of functioning and replacement of the thermostat
   Check of a condition of the fan(s) of the cooling system and chain of its inclusion, replacement of the fan(s)
   Removal and installation of a radiator and broad tank of the cooling system
   Removal and installation of the oil cooler
   Check of a condition of the water pump
   Replacement of the water pump
   Check of serviceability of functioning and replacement of the block of the sensor of the measuring instrument of temperature of cooling liquid
   Check of serviceability of functioning of a driving electric motor of the fan of a heater and condition of components of its electric chain, replacement of components
   Removal and installation of an electric motor of the drive of the fan of a heater
   Removal and installation of assembly of the control panel of functioning of a heater and conditioner of air, adjustment of a driving cable
   Replacement of the heat exchanger of a heater
   Check of serviceability of functioning and service of systems of heating and air conditioning
   Check of an electric chain of a clutch coupling of the K/V compressor
   Removal and installation of a receiver dehumidifier To/in
   Removal and installation of the K/V compressor
   Removal and installation of the K/V condenser
   Removal and installation of the K/V evaporator with the broad valve
+ Power supply system and release
+ Engine electric equipment
+ Control systems of the engine
+ Gear shifting box
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment


5642a57a



Removal and installation of the oil cooler

Before starting implementation of the procedure, wait for full cooling of the engine.


 PERFORMANCE ORDER

1. On some Integra models between a full-line oil filter and the block of the engine the oil cooler is installed (see an accompanying illustration).

2. Remove an oil filter and merge motive oil (see the Head Routine maintenance).
3. Disconnect two lines of a cooling path from the oil cooler. Prepare for collecting the spilled liquid. At once to a zakuporta open ends of lines and nipple connections.
4. Give the big nut (which is usually representing a part of a hollow fixing bolt) in the center of the oil cooler and separate the last from the engine.
5. Installation is made upside-down. Do not forget to replace the sealing ring established between the block and the oil cooler (before installation oil a new ring pure motive). Track reliability of fastening of hoses of cooling lines on the unions.
6. Establish a new oil filter and fill in in the engine fresh engine oil (see the Head Routine maintenance).
7. As necessary correct levels of cooling liquid and motive oil.
8. Start the engine and check it for existence of signs of leak of oil or cooling liquid.
9. Double-check levels of oil and cooling liquid.